Info-Work: Temporary Swing Bridge Closure
Trent-Severn Waterway National Historic Site
Peterborough, Ontario, December 17, 2020 – Parks Canada would like to advise that the Boundary Road Swing Bridge on Simcoe Street (near Bolsover) will be temporarily closed to vehicular traffic over the winter months, pending the approval of Contractor submissions. The bridge will re-open in summer 2021.
Public safety is a priority for Parks Canada. Residents are advised to follow detour signage and to exercise caution.
The Boundary Road Swing Bridge on Simcoe Street near Bolsover was constructed in 1902. Engineering inspections in recent years have indicated that a full replacement of the steel structure is required. The project will also include repairs to the concrete abutments, and the replacement of mechanical and electrical operating systems. The new bridge will maintain the historic look of the original.
Parks Canada is leading this important infrastructure work along the Trent-Severn Waterway National Historic Site to ensure safe, high-quality experiences for visitors by improving heritage, visitor, waterway, and highway assets located within national historic sites, national parks, and national marine conservation areas.
To ask questions or register to receive updates about any Trent-Severn Waterway construction project, please contact us at Ont.TrentSevern@pc.gc.ca and include the project name in the subject heading. More details about this work, or other construction work in your region, can be found at www.pc.gc.ca/tswKawarthaLakes.
Related links
- Boundary Road Swing Bridge
- Info-Work: Talbot dam maintenance
- Info-Work: Boundary Road Swing Bridge – Project Update
- Info-Work: Boundary Road Swing Bridge Construction Update
- Info-Work: Boundary Road Swing Bridge Construction Update
- Community Update: Dam at Lock 38 Construction Update
- Boundary Road Swing Bridge Construction Update
- Community Update: Dam Demolition to Begin
- Info-Work: Temporary Bridge Closure: Boundary Road Swing...
- Community Update: Conservation During Construction -...
- Community Update: Part 1 - The Dams
- Community Update: Update on Parks Canada Construction...
- Community Update: Talbot Area
- Community Update: Walleye and Chorus Frog Surveys Underway
- Community Update: Replacement of the Talbot Dam
- Community Update: Replacement of the Talbot Dam
- Community Update: Update on Parks Canada Construction...
- Community Update: Talbot Dam Replacement
- Info-Work: Temporary Closure of Boundary Road Swing Bridge
- Concrete Rehabilitation, Locks 39 - 41
- Date modified :