The five locks and three dams in the Talbot area overcome a 75 foot difference in water elevation between Canal Lake and Lake Simcoe. This section of the Trent-Severn Waterway was originally contracted for construction in 1900, and was officially opened in June 1907.
Talbot Dam
Construction has begun on the project to replace the Talbot Dam. This dam is comprised of two sluices and will be replaced in phases so that water flow can continue through one sluice of the dam even while construction takes place. Pictured, one sluice has been sectioned off with a sheet pile cofferdam on the downstream side to hold water back from the construction site.This first phase lower cofferdam is in place and the first phase cofferdam above the dam is almost complete. Water will then be pumped out to create a dry work area, and demolition of the first half of the dam will begin in April or May.
Residents can expect construction noise through the demolition and reconstruction period. County Road 50 below the dam will remain open during construction, however there may be short temporary closures or lane reductions.
How to stay informed
Be a witness to this historic work. Check out what we’re up to at pc.gc.ca/tswInfrastructure.
A photo gallery of the Talbot area projects has been shared to Parks Canada’s website at parkscanada.gc.ca/tswTalbotSimcoe. More will follow in the coming weeks and months, so stay tuned.
Or, stay up-to-date on construction projects, boating activities and events by following our social media channels: Twitter @trentsevernnhs or Facebook/trentsevernnhs
If you would like to receive email updates about this project, please email us at: Ont.TrentSevern@pc.gc.ca and include “Talbot Area” in the subject heading.
Related links
- Boundary Road Swing Bridge
- Info-Work: Talbot dam maintenance
- Info-Work: Boundary Road Swing Bridge – Project Update
- Info-Work: Boundary Road Swing Bridge Construction Update
- Info-Work: Boundary Road Swing Bridge Construction Update
- Community Update: Dam at Lock 38 Construction Update
- Boundary Road Swing Bridge Construction Update
- Info-Work: Temporary Swing Bridge Closure
- Community Update: Dam Demolition to Begin
- Info-Work: Temporary Bridge Closure: Boundary Road Swing...
- Community Update: Conservation During Construction -...
- Community Update: Update on Parks Canada Construction...
- Community Update: Talbot Area
- Community Update: Walleye and Chorus Frog Surveys Underway
- Community Update: Replacement of the Talbot Dam
- Community Update: Replacement of the Talbot Dam
- Community Update: Update on Parks Canada Construction...
- Community Update: Talbot Dam Replacement
- Info-Work: Temporary Closure of Boundary Road Swing Bridge
- Concrete Rehabilitation, Locks 39 - 41
- Date modified :